• St Louis Zoo Roof
  • Maritz St Louis Roof
  • Edward Jones Dome

Projects  (Click on photos to enlarge)

Ford Motor Company Phosphate Plant — Atlanta, Georgia

Ford Motor Company Georgia

This 408,000 square foot facility stocks and distributes auto parts throughout the Southeast United States. Ongoing operations required daily coordination between facility engineers and Bi-State Roof Systems, Inc. Project was completed on time and under budget.

Scottrade Center

Scottrade Center

The configuration of the roof and its exterior appearance were used as the selection criteria for the roof membrane. A winter installation provided more than a wanted challenge for the 165,000 square foot structure. The speed of installation saved the project three weeks in the overall construction time. Weekly coordination meetings between the major sub-contractors were beneficial and offered insight as to how the fast pace construction was to be completed.

General Motors Company Service Parts Operation Ð Doraville, Georgia

General Motors Service Parts Operation

This 408,000 square foot facility stocks and distributes auto parts throughout the Southeast United States. Ongoing operations required daily coordination between facility engineers and Bi-State Roof Systems, Inc. Project was completed on time and under budget.

St. Charles Family Arena

St Charles Family Arena

The total project was completed within 18 months. The 137,000 square feet of roof membrane was completed within 63 working days and provided the facility the necessary protection to finalize the interior finishes. The leading edge of the main roof required Bi-State Roof Systems, Inc. to employ unique safety apparatuses to insure the safety of its own field forces as well as those working below.

page 1 2 3

©2010 Bi-State Roof Systems, Inc.